Since the beginning of this year, almost 1,05 million vehicles have passed through the Princess Xenia highway.
According to data from the Monteputa website, which manages the priority section of the highway from Smokovac to Mateševo, vehicle traffic in the period from July 8 to 14 amounted to 67,04 thousand.
Last year, since its opening in mid-July, a total of 1,14 million vehicles passed through the highway.
The priority section of the Bar-Boljara highway was ceremonially opened on July 13 last year, and the next day it was put into traffic.
The toll was free for the first seven days. After that, it amounts to 1,5 euros for motorbikes, 3,5 euros for passenger vehicles, and 17 euros for trucks and buses.
The total length of the first section of the highway is 41,5 kilometers, with 20 bridges on the main route, nine bridges on loop ramps, two overpasses, eight underpasses, 7,2 kilometers of concrete walls, as well as 16 double-tube tunnels.
The section has four interchanges, with toll ramps, on which the highway is connected to the existing state, namely - Smokovac, Pelev Brijeg, Veruša and Mateševo.
The maximum speed is limited to 100 kilometers per hour.
See more:
Download the app and follow the news
FOLLOW US ON