Contract concluded for the development of a preliminary design for the Andrijevica-Berane-Boljare highway section

The value of the contracted services is 3.654.000 euros, excluding VAT.

6619 views 6 comment(s)
Illustration, Photo: Shutterstock
Illustration, Photo: Shutterstock
Disclaimer: The translations are mostly done through AI translator and might not be 100% accurate.

The state-owned company Monteput announced that it has concluded a contract for the provision of services for the development of a preliminary design for the Bar-Boljare highway, section Andrijevica-Berane-Boljare, with the consortium "CDS Project - Via Project - Geotin MNE".

The length of the section that will be included in this project is 50 kilometers.

The value of the contracted services is 3.654.000 euros, excluding VAT. The deadline for the development of the conceptual design is 14 months from the date of conclusion of the contract.

"The development of the preliminary design represents a continuation of the intensive activities of the Monteput doo company on the development of project documentation for the construction of the remaining sections of the Bar-Boljare highway, with the aim of strengthening and modernizing the overall traffic infrastructure throughout Montenegro," the statement reads.

Bonus video: